8 inch Cast Steel Rising Stem gear operator Gate Valve
Purpose
This is used as acutoff and adjusting equipment for the various water supply and drainage pepeline in building ,chemial ,medicine,textile,ship and other industries.
Product Features
1.Such a design as the dustproof ring plus three layers of o-seal ring makes the sealing reliable and on-line replaceable.
2.The design with an aluminum bronze bearing inlaid in the gate leaves a good self-lubrication and a high strength.The said bearing can be replaced without need to replace the integral gate when worn out after a long time use.
3.The gate is wrapped with rubber,anti-corrosion and good at tightness.
4.Advanced surface treatment,coated with harmless epoxy resin static powder , anti-corrosion,non-pollution,can be used in a drinking pipeline.
5.The body is gate-slot free designed,the channel is smooth without causing impurities to be piled up,more suitable for sewage working condition.
6.Reliable integral sealing,zero-leak for high pressure sealing under 1.5times of PN and for low pressure sealing under 0.02Mpa.
Design and manufacture standard |
CJ/T216-2005 |
Structural length |
GB/T 12221 |
Size of flange |
GB/T 17241.6(cast iron),GB/T9113.1(cast steel) |
Test and inspection |
GB/T 13927 |
Q: Are you trading company or manufacturer ?
A: We are factory Located In Tianjin, China.
Q: What's your product range?
A: We produce Butterfly valve, Gate valve, Check valve, Y strainer ,Water Controlling Valve and other Pipe Accessories .
Q: What's Execution Standard?
A: ISO/ANSI/DIN/JIS/ EN/GOST/AS standard.
Q: What's your Strong product ?
A: Centre Line Butterfly valve, Eccentric Butterfly valve ,Resilient Seat Gate valve, and largest size to DN3200 .
Q: How long is your delivery time?
A: Generally it is 10 days if the goods are in stock. or it is 35 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 30% T/T in advance ,balance before shipment.